Sinocorp.Co.Ltd

We provide various model tower cranesand original parts.All products come withISOCE, and other certificates.

Manufacturer from China
Verified Supplier
2 Years
Home / Products / Construction Hoist /

SC200 2 Ton 2000kg Construction Elevator Precise

Contact Now
Sinocorp.Co.Ltd
Visit Website
City:jinan
Province/State:shandong
Country/Region:china
Contact Person:MrArthur
Contact Now

SC200 2 Ton 2000kg Construction Elevator Precise

Ask Latest Price
Video Channel
Brand Name :Sinocorp
Model Number :SC200
Place of Origin :China
MOQ :1
Price :53289
Payment Terms :T/T, L/C
Delivery Time :180 work days
Rated Loading Capacity(kg) :2000 * 2 Kg
Material :G350 Steel
Hoisting Motor :3*11kw
Electra Control System :Schneider
Color :Customized
Lift type :Rack and pinion
power supply :380V 50HZ or Customized
Max height :400M with Reinforced Mast
Surface Treatment :Hot Galvanized/Painting
Mast section :650*650*1508(mm) Weight:146Kg Q345
Cage size :3mx2.2mx1.5m
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

construction lifter sc200 building elevator lift

  1. Applications

    The SC200 load elevator is primarily used in construction projects for:

  2. Transporting construction materials such as bricks, concrete, and steel to upper floors.
  3. Moving equipment and tools to different levels.
  4. Elevating workers to workstations at various heights.

Regulatory Compliance

Construction hoists must comply with local safety regulations and standards. In the United States, for instance, the Occupational Safety and Health Administration (OSHA) sets standards for the use of hoists in construction. In Europe, hoists must comply with the Machinery Directive and may require CE marking.

Usage and Maintenance

To ensure the safe and efficient operation of an SC200 load elevator, regular maintenance and inspection are critical. This includes checking the structural integrity of the hoist, maintaining lubrication of moving parts, and ensuring that all safety mechanisms are functional. Operators must be properly trained and familiar with the hoist's operation and safety procedures.

Product Description

Here is our model:

Item Unit SC100 SC100/100 SC200 SC200 Standard Model SC200/200 Efficient Model
Rating loading capacity KG 1000 2 x 1000 2000 2 x 2000 2 x 2000
Passengers Person 10 20 20 40 40
Lifting Speed M/Min 34.4 34.4 34.4 34.4 30
Cage Size(LxWxH) M 3.2 x 1.5 x 2.6 3.2 x 1.3 x 2.6
Motor Power KW 2 x 11 2 x 2 x 11 3 x 11 2 x 3 x 11 2 x 2 x 15
Rated Brake Load of Speed Governor K/N 30 40
Max Lifting Height M 150-200
Mast Weight KG 158/172
Motor Braking Torque

NM

120
Rated Erection Load KG 200
Mast Section Size(LxWxH) M 0.65 x 0.65 x 1.508 0.8 x 0.8 x 1.508

Characteristics Model RatedLoading Lifting Speed Motor Power
Double Cages Lower-speed SC200/200D 2x2000kg 0-40m/min 2x(3x11kw) 2x(3 x8.5kw)
SC100/100D 2x1000kg 0-40m/min 2x(2x13kw)
Mid-speed SC200/200Z 2x2000kg 0-60m/min 2x(2x23kw)
sC100/100Z 2x1000kg 0-60m/min 2x(2x15kw)

Single

Cage

Lower-speed SC200D 2000kg 0-40m/min 3x11kw 3 x8.5kw
SC100D 1000kg 0-40m/min 2x13kw
Mid-speed SC200Z 2000kg 0-60m/min 2x23kw
SC100Z 1000kg 0-90m/min 3x23kw

Temporary or Permanent Installation: Construction hoists can be either temporarily or permanently installed. Temporary hoists are commonly used during the construction phase and are dismantled once the project is completed. Permanent hoists, on the other hand, are designed for long-term use in buildings where vertical transportation is required even after construction, such as in high-rise buildings or multi-story structures.

Product Display

SC200 2 Ton 2000kg Construction Elevator PreciseSC200 2 Ton 2000kg Construction Elevator Precise

Installation and Maintenance: Construction hoists are installed within the building or at the construction site using a hoist shaft or temporary structure. The installation process involves securing guide rails, assembling the drive machinery, and installing the carriages. Regular maintenance and inspections are essential to ensure the safe and reliable operation of the hoist. This includes routine checks of the electrical systems, mechanical components, safety devices, and compliance with relevant safety regulations.

Our Advantage

1.High quality of motor, low noise NORD Brand ,Schneider Control
2.Strong load ability, low voltage start
3.Reasonable optimization design, compact structure, convenient installation and debugging
4.Running the lift elevator before the delivery
5.Driving mechanism refueling debugging, customer without refueling
6.Selects the high quality gear reducer and anti dropping device

Packaging & Shipping

SC200 2 Ton 2000kg Construction Elevator Precise

Producing & Factory Environment

SC200 2 Ton 2000kg Construction Elevator Precise

SC200 2 Ton 2000kg Construction Elevator Precise

FAQ

Q1: Are you a trading company or a factory?
A1: We are a trading company and have our own factory. We have both the price advantage of the factory and the thoughtful service of the trading company; and the advantage of taking responsibility.
Q2: How long is your delivery time?
A2: If the goods are in stock, usually 5-10 days. Or if the goods are not in stock, then 15-20 days, depending on the quantity.
Q3: Do you provide samples ?
A3: In this field, we seldom provide samples, but it depands.
Q4:Why choose us?
A4: First,our product quality assurance and warranty for one year, steel structure warranty for lifetime and the price is cheap ;Second,we have 11 years of industry experience, so we are very professional.
Q5:Can we visiting your factory?
A5: We warmly welcome your visiting.

Inquiry Cart 0